Americhem Europe Ltd v Rakem Ltd and Another [2014] 4 Costs LR 682
[2014] 4 Costs LR 682
Costs budgets under CPR 3.13-14 – CPR PD3E – budget format; signature to statement of truth – signature by a costs draftsman does not make the costs budget a nullity.
You need to log on as a current subscriber to view this report.
If you are not a subscriber, you can subscribe now online at classlegal.com.
Or call 01652 652 222.